Monday, June 27, 2011

Hospital & Clinic Flooring

As we have seen in the last few posts the flooring has started to go be laid in both the clinic and the hospital setting. The additions that have been made in the last week include the carpet in the shared lobby and office, and the first flooring in the hospital with the hallway leading to the Emergency Room.  Here are a few pictures to show the updates.  We are hoping that we will be able to start working on the parking lot as it is dry enough to get working on it. With this hopefully working out, Crosby Clinic and ancillary departments of the Hospital will be able to move in to their new areas in the middle of July.

Hallway leading from the shared lobby in to Lab/X-Ray
& Emergency Room Services

Looking in to the shared lobby from the Hospital

Office in the new Clinic

Final touches being added to patient rooms
in the clinic

Looking out in to the Lobby from behind
the clinic registration and business office

Wednesday, June 22, 2011

Lab & X-Ray Flooring

The finishing touches are starting to take place in the new addition as the laboratory and x-ray floor has just been installed early on this week.

Looking in to X-Ray from the hallway

X-Ray from the storage area

Looking in to Laboratory from the hallway

Monday, June 20, 2011

Assisted Living Carpeting

View of the living room looking out on to the soon-to-be porch.

Kitchen cabinetry and counter tops.
The microwave will be placed above the stove.

Looking in to the master bedroom.


Looking in to the spare bedroom.

The master bedroom's walk-in closet, one is able to put in a
personal washer and dryer if they so choose.

Friday, June 10, 2011

Hospital Construction Update 06/10/2011

As summer comes around the hospital and clinic are working on some finishing touches inside. While the parking lot is another matter due to the recent weather, we are able to keep progressing inside. Here's a look at what we've been able to do recently. We are hoping if the weather cooperates to be moving in to the newly constructed areas by mid-July.


The Therapy Pool area for the Hospital's Physical Therapy
and Rehab department.

Clinic Room Tile has been added as well as the built-in
cabinetry.

The flooring that will be used in all Clinic hallways.

Clinic Nursing Station and ceiling tile that has been
completed through the clinic and part of the hospital.

The newly constructed Lab that is now located next
to the emergency department for better patient access.

Friday, June 3, 2011

Painting the Assisted Living

The countertops are finally in place in the Assisted Living, and we have begun to paint the private dining and entertainment room in the new addition.  Here are a few pictures to show you what we've done!